The original pumping station dated from 1960. It was about time for a complete makeover. With two new screw pumps to prevent flooding. The double pump is much safer than the single original, since now a back-up pump is available at all times.

Challenge

The available space at the construction site was very limited. Not easy to realize a new concrete tank in such circumstances. At the same time, we had to keep the temporary pump installation wit alarm system in operation. While we successfully adapted the original tank to buffer tank.

Client: 
Intercommunale IPALLE
Project: 

Pump station with two screw pumps with a maximum capacity of 750m³/h

Budget: 
500 000.00€